
Residential
Torrance ADU contractor.
Looking for an ADU contractor in Torrance? DECOMA designs, permits, and builds detached, garage-conversion, and junior ADUs across Old Torrance, the Hollywood Riviera, and West Torrance.
Why torrance adu
Torrance ADU contractor — design, permits, and build under one roof
If you're searching for an ADU contractor in Torrance, the first thing worth knowing is that the hard part isn't the design — it's the lot, the zoning, and the permit. DECOMA designs, permits, and builds accessory dwelling units across Old Torrance, the Hollywood Riviera, West Torrance, and the Walteria and Southwood tracts, with one licensed team from the first lot walk to the certificate of occupancy. No handoff between a designer and a separate builder, and no finger-pointing when something doesn't line up.
How much does an ADU cost in Torrance?
It's the question everyone asks first, and the honest answer is: it depends on what you build. A garage-conversion ADU, a detached new-build ADU, and a junior ADU are different projects with different price tags — then site work, sewer, and finish level move the number further. We don't quote a figure before we've walked the lot. What we do on the free consult is give you an honest range and design backward from your real budget, so you get an ADU that actually builds for the number you have — and one that adds rental income and resale value, which is why most Torrance owners build.
Types of ADUs we build
- Detached ADU — a standalone unit in the rear yard; the most private and the most flexible to design.
- Attached ADU — added onto the existing house, often the most efficient on a tight Old Torrance lot.
- Garage conversion — converting an existing garage; usually the fastest path and frequently parking-exempt.
- Junior ADU (JADU) — up to 500 sq ft within the existing home, sometimes called a granny flat or in-law unit.
We pick the type on the lot walk based on your goal — rental income, multi- generational living, or a home office — and what your lot will actually hold.
ADU rules and zoning in Torrance
Torrance isn't one place to build. Old Torrance — the original downtown grid around El Prado and Marcelina — carries smaller historic lots and the city's oldest infrastructure, where attached ADUs and garage conversions usually fit best. The Hollywood Riviera, in the southwest toward the Redondo and Palos Verdes borders, runs uphill with view lots and slope to manage. West Torrance, North Torrance, Walteria, and Southwood are mostly flatter single-family R-1 tracts where detached ADUs and garage conversions go in cleanly. The lever that matters in all of them is the same: Torrance reviews ADUs against objective standards on the ministerial pathway, which is faster and far more predictable than a discretionary hearing.
How long does a Torrance ADU take? The permit process
The single biggest thing to understand about building in Torrance is that the city runs its own permitting. Torrance has its own Building & Safety department at 3031 Torrance Blvd — it is not LA County, and it moves at its own pace. Knowing how to carry a set through Torrance B&S is half the job, and the half a first-time contractor usually gets wrong. We draw to the city's plan-check conventions up front and run the corrections cycle, typically 8–14 weeks, then 5–9 months of construction. Two items we check early: sewer capacity on older Old Torrance laterals, and parking, which state law usually waives for garage conversions and transit-adjacent lots. For exactly what the counter looks for, read our field notes on ADU permits in Torrance.
Why DECOMA for your Torrance ADU
The expensive failures on ADUs happen in the handoff — a designer draws something the lot or zoning can't carry, or the permit set doesn't match what gets built. Because the people who draw your ADU are the people who build it, that gap doesn't exist: one contract, one schedule, one point of accountability. Torrance is the heart of our portfolio — we redeveloped Blair House at the northern gateway of Old Torrance and design-built the Marcelina Lofts just off El Prado — and the same team serves the rest of Torrance and the South Bay, under one license since 1978.
Tell us your lot and what you're picturing. The first consult is free, 30 minutes, and ends with an honest read on whether your Torrance ADU pencils.
How we run it
Scope to sign-off.
01
Free ADU feasibility & lot walk
We check setbacks, lot coverage, zoning, sewer, and service capacity on site — and which Torrance you're in. Old Torrance's small historic lots, the Hollywood Riviera's hillside view lots, and the flatter R-1 tracts of West and North Torrance each build differently. You get a straight read before you pay for design.
02
Design, plans & Torrance permits
Construction documents drawn to City of Torrance standards and submitted on the ministerial ADU pathway where it applies. Torrance runs its own Building & Safety counter at 3031 Torrance Blvd — separate from LA County — and we run the corrections cycle there directly, no third-party expediter.
03
Build & certificate of occupancy
Foundation, frame, MEP, finishes, and any sewer, panel, or service upgrade — structural work self-performed under our Class A/B license. Typically 5–9 months on site, ending in final inspection and certificate of occupancy.
Why DECOMA
One license, three disciplines, forty years.
Family-run South Bay general contractor since 1978. We design, build, and manage — under one license — so the team you start with is the team that hands you keys and the team that answers the phone when something needs fixing in year ten.
- Years building
- 48+
- Projects delivered
- 3,000+
- Repeat clients
- 300+
- CSLB Class
- A/B
FAQ
Common questions.
How much does an ADU cost in Torrance?
How long does it take to build an ADU in Torrance?
Does DECOMA pull ADU permits through the City of Torrance?
Can I build an ADU on a small Old Torrance lot?
Can I rent out my Torrance ADU?
Do you do garage-conversion ADUs and junior ADUs (JADUs)?
Service areas
Torrance adu across the South Bay.
Born in Harbor City, working across LA County since 1978. Same crew, same license number, same shop at 25941 Frampton Ave, Harbor City.
Continue exploring
More from torrance.
All of torranceTalk to a contractor
Tell us about your project.
One business day for a scope, timeline, and budget range. CSLB #375508 A/B.