
Parking solutions
Parking lot striping in Los Angeles and the South Bay.
Layout, ADA stalls, crosswalks, and directional markings for LA and South Bay parking lots — striped by the same licensed crew that maintains the lot.
Why striping
Striping for lots we already know
We stripe parking lots across Los Angeles and the South Bay — Torrance, Harbor City, the beach cities, and San Pedro — usually for the commercial owners and property managers whose lots we already maintain. That matters because striping is rarely the whole job: the same visit often catches failed asphalt, ponding at a drain, or an ADA stall that no longer meets code, and one licensed crew can fix all of it instead of flagging it for another vendor.
What a striping job includes
- ADA-compliant accessible stalls, aisles, and signage laid out to current California standards.
- Layout and re-layout — stalls, pedestrian pathways, loading zones, and fire lanes.
- Arrows, crosswalks, curb paint, and directional flow for safer circulation.
- Heavy-duty, weather-resistant traffic paint suited to high-turnover lots.
- Night and weekend scheduling so tenants and customers keep their parking.
Part of a full parking program
Most owners call us for a stripe and stay for the program: resurfacing, drainage, sweeping, lighting, and signage handled by the same team, on one schedule, under one CSLB Class A/B license.
Why DECOMA
One license, three disciplines, forty years.
Family-run South Bay general contractor since 1978. We design, build, and manage — under one license — so the team you start with is the team that hands you keys and the team that answers the phone when something needs fixing in year ten.
- Years building
- 48+
- Projects delivered
- 3,000+
- Repeat clients
- 300+
- CSLB Class
- A/B
Service areas
Striping across the South Bay.
Born in Harbor City, working across LA County since 1978. Same crew, same license number, same shop at 25941 Frampton Ave, Harbor City.
Continue exploring
More from parking.
All of parkingTalk to a contractor
Tell us about your project.
One business day for a scope, timeline, and budget range. CSLB #375508 A/B.