Detached, attached, garage-conversion, and junior ADUs across the South Bay — fully permitted under California state law, design through certificate of occupancy.
Why adu construction
An ADU is the cheapest square footage you can legally build on your lot — and the rules in 2026 are more permissive than most homeowners realize.
California has spent the last six years systematically removing the barriers that used to make ADUs hard. Owner-occupancy requirements: repealed. Parking-replacement requirements: gutted. Local-government approval discretion: heavily restricted. The result is that on almost any single-family lot in the South Bay, you can permit and build at least one detached ADU up to 1,200 square feet — ministerially, by-right, without going to a hearing.
What hasn't changed is the work itself. ADUs are real construction. Foundation, framing, plumbing, electrical, fire separation from the main house, sewer capacity, water meter sizing, electrical panel upgrades, weatherproof envelope, and finishes — all permitted, all inspected, all under code. The shortcut articles online that promise "ADU in 90 days from a shed kit" leave out the parts that go wrong.
DECOMA permits and builds ADUs across every South Bay city we serve: Manhattan Beach, Torrance, Redondo Beach, Palos Verdes Estates, Hermosa Beach, El Segundo, Rancho Palos Verdes, Harbor City, San Pedro, and the City of LA. Each city has its own plan-check quirks — Manhattan Beach's height calculation, Torrance's lot-coverage math, Palos Verdes' Art Jury triggers — and we've run them all multiple times.
Garage conversion, attached, detached, or junior ADU — the right answer depends on your lot, your budget, your goal (rental income, multi-generational housing, workspace), and how long you can wait. Start with a free 30-minute consultation: we walk the lot, tell you what's allowed, lay out the three or four ADU paths your lot actually supports, and give you an honest range on each.
Start with a free consultation → — or read our recent blog posts on ADU permits in Manhattan Beach and Palos Verdes Estates.
Written by John Notaro, President & CEO, DECOMA Industries — CSLB A/B #375508, California Real Estate Broker.
What you get
Everything we deliver.
- 01
Feasibility & lot analysis
Setback math, lot-coverage check, sewer-vs-septic, electrical service capacity, easements, and grade. Done in week one so we know what kind of ADU your lot will actually hold before we start design.
- 02
Design & plans
Schematic and construction documents for detached, attached, garage-conversion, or junior ADU. Drawn to your specific city's plan-check standards — Manhattan Beach, Torrance, Redondo, Palos Verdes Estates, Hermosa, El Segundo each have their own conventions.
- 03
Permits & state-law positioning
Permit submittal positioned to use SB 9, SB 13, AB 2533, AB 1033, or AB 670 where they help — ministerial approval, height bonuses, parking exemptions, sale-to-third-party rights. We pick the right statute, you get the permit.
- 04
Utilities & service upgrades
Sewer or septic capacity check, water meter sizing, electrical panel and service upsizing, gas line extension, separate-metering where required. Coordinated with the existing house's systems so nothing gets oversubscribed.
- 05
Construction
Foundation, frame, weather-in, MEP rough, drywall, finishes, and exterior cladding. Self-performed structural and framing under our Class A engineering license. Typical on-site duration 5–9 months depending on size and type.
- 06
Final & certificate of occupancy
Final inspections, gas and electric meter activation (if separate), certificate of occupancy, and a warranty walk. We'll connect you with a property manager if you're renting it out.
How we run it
Scope to sign-off.
01
Lot walk & feasibility
On-site visit to see the lot, the existing house, and the access route for construction. We pull zoning, setback rules, and any HOA restrictions before we leave. About 90 minutes on-site, results within a week.
02
Design path selection
Detached, attached, garage conversion, or JADU — we pick the path based on your goal (rental income vs. multi-generational housing vs. workspace) and your lot constraints. Each path has different cost, schedule, and permit implications.
03
Plans & permit submittal
Construction documents drawn to your city's plan-check standards. Permit cycle is typically 8–16 weeks in South Bay cities (ministerial ADU pathways are faster than discretionary). We handle the corrections rounds with the city.
04
Construction
Demo (for garage conversion), foundation, frame, weather-in, MEP rough, drywall, finishes, exterior cladding, landscape integration. 5–9 months on-site for most ADUs.
05
Certificate of occupancy & lease-up
Final inspections, meter activation, CO, and walk-through. If you're renting, we hand off to a property manager (in-house or yours) with as-built drawings and a maintenance plan.
Why DECOMA
One license, three disciplines, forty years.
Family-run South Bay general contractor since 1978. We design, build, and manage — under one license — so the team you start with is the team that hands you keys and the team that answers the phone when something needs fixing in year ten.
- Years building
- 48+
- Projects delivered
- 3,000+
- Repeat clients
- 300+
- CSLB Class
- A/B
FAQ
Common questions.
What size ADU can I build on my lot?
Which is better — detached, attached, garage conversion, or junior ADU?
How long does a South Bay ADU take?
Do I have to live in the main house if I build an ADU?
Will the ADU affect my property taxes?
Can DECOMA also manage the ADU after it's built?
Service areas
Adu construction across the South Bay.
Born in Harbor City, working across LA County since 1978. Same crew, same license number, same shop at 25941 Frampton Ave, Harbor City.
Continue exploring
More from residential.
All of residentialTalk to a contractor
Tell us about your project.
One business day for a scope, timeline, and budget range. CSLB #375508 A/B.