Rancho Palos Verdes general contractor.

Rancho Palos Verdes — built to local rules.

Rancho Palos Verdes covers more ground — and more geological complexity — than any other PV community. We've built across the peninsula from Miraleste to Portuguese Bend, and we know which lots need real engineering before they need a contractor.

Start with the landslide ordinance, because it decides everything.

On 19 August 2025 the city adopted a landslide regulation ordinance that prohibits new residential construction in the covered zones — and it expressly includes home additions. What stays permitted is replacing, restoring and repairing development within its existing footprint.

The covered zones are Portuguese Bend, Zone 2 Monks Lots, and Zone 2 Non-Monks Lots. That 2025 ordinance also pulled in eight further properties: seven in Seaview and one in the Portuguese Bend Beach Club.

There is an existing process to apply for a parcel to be excluded from the regulation area, with strict submittal criteria and findings that include a safety threshold.

Two things follow from this. First, an RPV project starts with confirming which side of that boundary the parcel is on — the line has moved more than once and any answer more than a few months old is stale. Second, an owner inside the zone is not out of options, but the honest conversation is about repair, restoration and like-for-like replacement, not the addition they came in asking for. We would rather have that conversation at the first site walk than after a set of drawings.

Sixteen feet is the ceiling, and it is lower than you think.

Single-family residential in RPV is limited to sixteen feet by right. Anything taller requires a Height Variation Permit.

Set that against thirty feet in Torrance and Redondo Beach, or twenty-six to thirty-two in El Segundo, and the peninsula's design vocabulary explains itself. Sixteen feet is a single story with a considered roof, not a two-story house with a compromise.

The number is tied to the city's view regime. RPV's view preservation comes from Proposition M, passed in 1989 and codified at RPVMC 17.02.040, and a structure at or below sixteen feet is not treated as blocking a protected view. Building above the line is possible; it just means the view analysis becomes part of the project.

Neighborhood Compatibility is a real review.

Before a grading or building permit issues, every new residence is subject to a Neighborhood Compatibility analysis under RPVMC 17.02.030.B. The design is assessed against the character of what already surrounds it — scale, bulk, and how it sits among its neighbors.

Projects that arrive having considered that read very differently from projects that arrive arguing with it, which is the same lesson the Art Jury teaches one city over in Palos Verdes Estates.

Plan check runs through Transtech.

Building & Safety sits at 30940 Hawthorne Boulevard, open Monday to Thursday 7:30am to 5:30pm and Friday 7:30am to 4:30pm, closed noon to one each day. Submittals go through the city's electronic portal at rpvca.gov/plancheck.

The review itself is performed by Transtech, a third-party plan check service, with corrections and approvals emailed rather than handed across a counter. The first submittal takes up to ten business days once accepted; resubmittals and revisions take up to five. Inspections are scheduled at (310) 544-5279.

Geology first, drawings second.

This is the one city in our service area where we will not price a project from a plan set alone. Portions of RPV sit inside a mapped landslide regulation area and the Portuguese Bend complex has been moving measurably. Geotechnical investigation is the starting point here, not a late box to tick.

Where we've worked.

Hillside customs in the Crest Road corridor, ocean-view remodels in Miraleste, and full-down-to-the-studs renovations on Crenshaw Boulevard properties. Our nearest published peninsula projects sit in the adjacent cities — the Valmonte Home and our Palos Verdes work in PVE, and the Cabrillo Bungalows in San Pedro.

Start an RPV project.

Begin with a free consultation, and expect the first conversation to be about geology and parcel status rather than finishes. Planning a backyard unit? See our Rancho Palos Verdes ADU page.

We take projects across all of Rancho Palos Verdes' 90275.

Neighboring cities we work in: Palos Verdes Estates, Rolling Hills, Rolling Hills Estates, San Pedro, and Torrance.

FAQ

Common questions.

Can you still build in the Portuguese Bend landslide area?
Not new construction. Under the landslide regulation ordinance the city adopted on 19 August 2025, new residential construction is prohibited in the covered zones — and that expressly includes home additions. What remains permitted is replacing, restoring and repairing development within its existing footprint. Before anyone draws anything, we confirm which side of that line a parcel sits on.
Which zones does the landslide ordinance cover?
Portuguese Bend, Zone 2 Monks Lots, and Zone 2 Non-Monks Lots. The 2025 ordinance also expanded the boundary to eight further properties — seven in the Seaview neighborhood and one in the Portuguese Bend Beach Club. Boundaries have moved more than once, so parcel-level confirmation is the first step, not a formality.
Can a property get out of the landslide regulation area?
There is an existing process to apply for exclusion, but the criteria are strict and the findings include a safety threshold. It is a real option for some parcels and a waste of months for others, and the geology tells you which before the paperwork does.
How tall can I build in Rancho Palos Verdes?
Sixteen feet by right in single-family residential. Anything above that needs a Height Variation Permit, and a structure at or below sixteen feet is not treated as blocking a protected view. That single number shapes more RPV designs than any other rule in the code.
What is Neighborhood Compatibility and does it apply to me?
It is an analysis required under RPVMC 17.02.030.B for all new residences before a grading or building permit issues. Your design is evaluated against the character of what surrounds it. It is not a formality and it is not something to discover late.
How long does RPV plan check take?
The first submittal takes up to ten business days once the project status is accepted, and subsequent submittals and revisions take up to five. Review is performed by Transtech through the city portal at rpvca.gov/plancheck, with corrections and approvals emailed. Building & Safety is at 30940 Hawthorne Blvd, (310) 544-5280.

Talk to a contractor

Tell us about your project.