Manhattan Beach custom home builder.

Manhattan Beach — built to local rules.

Manhattan Beach is one of the most coveted — and most regulated — places to build in Los Angeles. Tight lots, strict design review, and clients who've earned the right to be exacting. We're built for that.

How Manhattan Beach is different.

MB's planning department reviews almost every project. Heights, setbacks, FAR, and aesthetic review can stretch a poorly-prepared scope by months. We come in pre-aligned: drawings that anticipate the conditions, a permit timeline that's honest, and a crew that knows the inspectors by name.

Building & Safety sits at 1400 Highland Avenue, open Monday through Thursday, 7:30am to 5:30pm with alternate Fridays. Plan check normally runs six to ten weeks, and expedited review is available. Above 26 feet, Hill Section design review adds a step that catches second-story additions which would clear without comment inland.

Site conditions that move the schedule.

The lots here are sand. Perimeter footings routinely go 36 inches or deeper, and any cut past roughly 18 inches is worth a geotechnical report before rather than after. Wind exposure is Category D within a mile of the coast, which drives framing and connector requirements under ASCE 7.

West of Sepulveda, salt-air corrosion is high. We specify marine-grade stainless and Galvalume on exposed assemblies because standard hardware does not survive the exposure — a lesson the neighborhood teaches every owner eventually. The May Gray and June Gloom marine layer narrows the window for exterior finish work, so paint and coatings get scheduled around it rather than through it.

Where we've worked.

Sand-section new builds where every foot of FAR matters, hillside Tree Section additions, and full-down-to-the-studs renovations in the Hill Section. We build to the level of finish MB buyers expect — and to the schedule MB neighbors require. Our nearest published projects sit just south, including the Raymond Estate in Hermosa Beach.

Our work runs across the Sand Section, Hill Section, Tree Section, and El Porto.

Manhattan Beach permit guides.

Manhattan Beach is the city we have written up most thoroughly — what the counter at 1400 Highland actually asks for, job type by job type:

Start a Manhattan Beach project.

Custom homes, additions, ADUs, and full renovations. Begin with a free consultation, or see how we approach residential new build and renovation.

We take projects across all of Manhattan Beach's 90266.

Neighboring cities we work in: Hermosa Beach, El Segundo, and Redondo Beach.

FAQ

Common questions.

Where do Manhattan Beach permits get pulled?
Community Development — Building & Safety at 1400 Highland Ave, open Monday through Thursday, 7:30am to 5:30pm with alternate Fridays. Manhattan Beach is its own jurisdiction, and expedited review is available when a schedule genuinely needs it.
How long does plan check take in Manhattan Beach?
Six to ten weeks is the normal window — longer than Torrance or Redondo, and the coastal cities do not reward an incomplete first submittal. For a full custom home, plan on several additional months across design, structural, Title 24, and design review before the permit issues.
Are you experienced with Manhattan Beach design review?
Yes. The MB Planning Commission and design review process is part of every project here. We pre-design to MB code, pre-meet with planning, and routinely move projects through review on the first or second pass.
Does the Hill Section have extra requirements?
Hill Section design review applies above 26 feet, which catches second-story additions and new builds that would pass without comment elsewhere in the city. Most Manhattan Beach homes are not under an HOA, so this city process is the binding one.
What does salt air change about the spec?
West of Sepulveda, corrosion exposure is high enough that we specify marine-grade stainless and Galvalume rather than standard hardware. Wind exposure is Category D within a mile of the coast, which raises framing and connector requirements under ASCE 7.
How deep do footings go on a sand-section lot?
Coastal sand often puts perimeter footings at 36 inches or deeper, and we recommend a geotechnical report on anything cutting more than about 18 inches. It is a cheap report relative to discovering the condition at foundation inspection.

Talk to a contractor

Tell us about your project.

One business day for a scope, timeline, and budget range. CSLB #375508 A/B.