Skip to content

El Segundo commercial contractor.

El Segundo — built to local rules.

El Segundo runs on aerospace, tech, and the kind of light-industrial real estate that needs a contractor who can think in shifts. We've built and serviced ES tenants for forty years — from Raytheon-adjacent fit-outs to Class A office TIs along Continental Boulevard.

El Segundo is fast, and that is unusual.

Regular plan check here runs one to four weeks depending on scope, and the clock starts when the plan review fees are paid rather than when you hand the package over. The city also runs an Accelerated Plan Check aimed at seven working days.

Set that against Palos Verdes Estates at eight to fourteen weeks with no expedited option, or Manhattan Beach at six to ten. El Segundo is the quickest jurisdiction in our service area, and on a commercial fit-out with a signed lease and a move-in date, that difference is the whole schedule.

The trade is precision at intake. Applications go to permits@elsegundo.org at least two days before a counter review, and a package that arrives short gets held rather than hurried.

The FAR cap decides what you can actually build.

The single most common surprise on an El Segundo residential project is not height, it is floor-area ratio. R-1 allows 0.60 FAR overall, but the second floor is separately capped at 0.25.

On a 5,000 square-foot lot — the R-1 minimum — those published standards work out to roughly 3,000 square feet of house with no more than about 1,250 of it upstairs. Owners who have only checked the height limit draw a full second story, and the ratio takes it apart at plan check.

Height in R-1 is 26 feet and two stories for a flat roof, 32 feet for a pitched roof. Front setback is 22 feet, deeper than most beach cities, and side yards are 10% of lot width with a 3-foot floor.

Smoky Hollow is its own rulebook.

The Smoky Hollow Specific Plan governs the Smoky Hollow-East, Smoky Hollow-West, and Parking districts with development standards written specifically for that area. A tenant improvement or adaptive reuse inside those boundaries answers to the specific plan, not to the citywide standards — and that is exactly the kind of thing a contractor from outside El Segundo misses on a first submittal.

Building on the dunes.

El Segundo sits on the historic El Segundo dune field, and coastal dune sand is what most of the city is founded on. It is worth pricing a geotechnical review into an addition or any meaningful cut rather than treating it as an exception. Corrosion exposure is moderate west of Sepulveda and mild in the sheltered aerospace corridor east of it, so the exterior spec can reasonably differ between two projects a mile apart.

El Segundo services.

Most of our El Segundo work is commercial — TI, build-out, and ground-up — but we build residential here too, including ADUs in El Segundo on the small Village lots west of Sepulveda. Start with a free consultation.

We take projects across all of El Segundo's 90245.

Neighboring cities we work in: Manhattan Beach, Hermosa Beach, and Los Angeles.

FAQ

Common questions.

How fast is plan check in El Segundo?
Regular plan check runs one to four weeks depending on scope, timed from the date the plan review fees are paid rather than the date you drop the package off. El Segundo also offers an Accelerated Plan Check that targets completion within seven working days. That is fast for the South Bay.
How do I submit a permit application in El Segundo?
Applications go to permits@elsegundo.org at least two days before a counter review. Building & Safety is at 350 Main Street; the division line is (310) 524-2380 and inspections are scheduled at (310) 524-2379.
Why won't my second story fit on an El Segundo lot?
Because of the floor-area ratio. R-1 allows 0.60 FAR overall but caps the second floor at 0.25 FAR. On a 5,000 sq ft lot — the R-1 minimum — that is roughly 3,000 sq ft of house with no more than about 1,250 of it upstairs. Most disappointing El Segundo remodels are second-story plans drawn before anyone checked that ratio.
What are the El Segundo height limits?
In R-1, 26 feet and two stories for a flat roof, 32 feet for a pitched roof. Front setback is 22 feet minimum, which is deeper than most of the beach cities, and side yards are measured at 10% of lot width and never less than 3 feet.
Do you handle aerospace-adjacent tenant improvements in El Segundo?
Yes. Class A office TI, secure-floor build-out, MEP retrofit, and clean-room-adjacent finish work for aerospace tenants. We hold the schedule against tenant move-in dates that don't move.
Is Smoky Hollow permitted differently?
It is. The Smoky Hollow Specific Plan sets its own development standards across the Smoky Hollow-East, Smoky Hollow-West, and Parking districts, separate from the citywide zoning. If your building sits inside it, the specific plan is the document that governs, not the general R or M standards.

Talk to a contractor

Tell us about your project.

One business day for a scope, timeline, and budget range. CSLB #375508 A/B.