Skip to content
EV charger installation in a parking facility by DECOMA Industries

Parking solutions

EV Charger Installation

With the growing shift toward electrified mass transportation, the need for efficient and high-capacity electric bus charger installations has become.

Why ev charger installation

Scalable Electric Bus Charging Solutions

With the growing shift toward electrified mass transportation, the need for efficient and high-capacity electric bus charger installations has become critical for transit systems, schools, and corporate shuttle services. DECOMA Industries specializes in creating tailored solutions for large-scale bus charging infrastructures, ensuring that fleets have access to reliable, fast, and safe charging systems. Our installations are designed to support the unique demands of electric buses, which often require higher voltage charging and more robust electrical systems than standard EV chargers. From strategic site assessment and electrical grid planning to charger placement and installation, we provide a complete solution that is not only functional but scalable for future growth in electric bus adoption.

Our EV Charger Installation Process

  • Site assessment and planning for high-capacity bus chargers.
  • Evaluation and upgrade of electrical infrastructure.
  • Coordination with utility providers for power supply optimization.
  • Strategic charger placement for fleet efficiency.
  • Scalable systems to support growing fleets.
  • Fast charging solutions to minimize vehicle downtime.
  • Integration with existing depot or parking infrastructure.
  • User-friendly systems for drivers and maintenance teams.
  • Compliance with industry standards for electric bus charging.
  • Focus on long-term performance and sustainability.

Why DECOMA

One license, three disciplines, forty years.

Family-run South Bay general contractor since 1978. We design, build, and manage — under one license — so the team you start with is the team that hands you keys and the team that answers the phone when something needs fixing in year ten.

Years building
48+
Projects delivered
3,000+
Repeat clients
300+
CSLB Class
A/B

Service areas

Ev charger installation across the South Bay.

Born in Harbor City, working across LA County since 1978. Same crew, same license number, same shop at 25941 Frampton Ave, Harbor City.

Talk to a contractor

Tell us about your project.

One business day for a scope, timeline, and budget range. CSLB #375508 A/B.