Why choosing an adu contractor
The short answer
Hire a California-licensed general contractor who will take responsibility for permits and construction under one written contract, can show you similar finished work, and knows your city's plan-check process. Check the license yourself, compare at least two detailed bids, and don't pay more up front than California allows.
We're a South Bay general contractor, so we have a stake in who you hire. This guide is written so you can use it on any contractor, including us.
Start with the license
Look up every contractor on the CSLB license check before you meet twice. It takes about a minute. You're looking for:
- Active status. Make sure the name on the record matches the company on the contract.
- The right classification. A Class B General Building license is the usual fit for a whole ADU. A single-trade license may not cover the entire job.
- Bond and workers' compensation. Both appear on the record. If a contractor says they have no employees, ask who will actually be on your site.
Eight questions to ask every ADU contractor
- How many ADUs have you finished in the last few years, and can I see one? Ask for addresses or photos, plus at least three local references.
- Who pulls the permits? The answer should be the contractor, in writing.
- Who will run my job day to day? Get a name, and ask how many other jobs that person is running.
- What's checked before design starts? Listen for sewer capacity, electrical service, setbacks, easements, grade, and construction access.
- Which work do you do yourselves, and what do you subcontract? Neither answer is automatically wrong, but you should know who is on your property.
- What isn't included in this price? Get exclusions in writing, especially utility work and panel upgrades.
- How long will it take, and what would change that? For scale, we plan on roughly 4 to 6 months for a garage conversion and 10 to 14 months for a detached new build, longer where discretionary review applies.
- How do you handle changes? Every change should be a signed change order that states the price and schedule impact before the work happens.
What California lets a contractor charge
These rules come from the Contractors State License Board, which specifically names ADU construction.
- Down payment: no more than 10 percent of the contract price or $1,000, whichever is less.
- Progress payments: listed in dollars and cents, tied to specific work or materials, and collected only after that work is done or those materials are delivered.
- "Plans" and "permits" charges: be careful with these before work starts. CSLB suggests asking for an accounting of plan costs and confirming permit costs with the building department.
There's an exception for contractors with a qualifying bond or approved joint control arrangement. If someone asks for more than the limit, ask for the documentation first.
Red flags
- They ask you to pull the permit as the owner-builder.
- They want a large deposit to "lock in" pricing or buy materials.
- The bid is one lump sum with no scope, exclusions, or payment schedule.
- They promise an approval date. A contractor can manage a submittal, but the city controls the review.
- They haven't asked about your sewer line, electrical panel, or setbacks.
- The name on the contract doesn't match the license record.
Why South Bay experience matters
State law sets the floor for ADUs, but the review still happens locally, and each city runs it differently:
- City of Los Angeles areas, including Harbor City, go through LADBS.
- [Torrance](/service-areas/torrance/adu-contractor/) has its own building department at 3031 Torrance Blvd.
- [Palos Verdes Estates](/service-areas/palos-verdes-estates/adu-contractor/) can add Art Jury review, which affects both design and schedule.
Ask each contractor which permits they've taken through your city, and what came back in corrections. Someone who has done it can tell you specifics.
When we're not the right choice
If you want to act as your own builder and hire the trades yourself, or you're choosing strictly on the lowest number, you'll likely be better served elsewhere.
DECOMA fits best when you want one licensed team responsible from the lot walk through the certificate of occupancy. We're a family-run company based in Harbor City, working since 1978 under CSLB #375508, Class A and B. You can see how we approach the work on our ADU construction page, or schedule a free consultation and bring these questions with you.
Why DECOMA
One license, three disciplines, forty years.
Family-run South Bay general contractor since 1978. We design, build, and manage — under one license — so the team you start with is the team that hands you keys and the team that answers the phone when something needs fixing in year ten.
- Years building
- 48+
- Projects delivered
- 3,000+
- Repeat clients
- 300+
- CSLB Class
- A/B
FAQ
Common questions.
Who should I hire to build an ADU in the South Bay?
What license does an ADU contractor need in California?
How much can an ADU contractor ask for up front?
Should I hire an architect first or a contractor first?
Should I just take the lowest ADU bid?
Is it a red flag if a contractor asks me to pull the permit?
When is DECOMA not the right choice for an ADU?
Service areas
Choosing an adu contractor across the South Bay.
Born in Harbor City, working across LA County since 1978. Same crew, same license number, same shop at 25941 Frampton Ave, Harbor City.
Talk to a contractor
Tell us about your project.
One business day for a scope, timeline, and budget range. CSLB #375508 A/B.