Redondo Beach ADU contractor.
Looking for an ADU contractor in Redondo Beach? DECOMA designs, permits, and builds detached, garage-conversion, and junior ADUs across North Redondo, South Redondo, and the Riviera.
Why redondo beach adu
Redondo Beach ADU contractor — design, permits, and build under one roof
If you're searching for an ADU contractor in Redondo Beach, the first thing worth knowing is that the hard part isn't the design — it's the lot, the zoning, and the permit. DECOMA designs, permits, and builds accessory dwelling units across North Redondo, South Redondo, and the Riviera, with one licensed team from the first lot walk to the certificate of occupancy. No handoff between a designer and a separate builder, and no finger-pointing when something doesn't line up.
How much does an ADU cost in Redondo Beach?
It's the question everyone asks first, and the honest answer is: it depends on what you build. A garage-conversion ADU, a detached new-build ADU, and a junior ADU are different projects with different price tags — then site work, sewer, and finish level move the number further. We don't quote a figure before we've walked the lot. What we do on the free consult is give you an honest range and design backward from your real budget, so you get an ADU that actually builds for the number you have — and one that adds rental income and resale value, which is why most Redondo owners build.
Types of ADUs we build
- Detached ADU — a standalone unit in the rear yard; the most private and the most flexible to design.
- Attached ADU — added onto the existing house, often the most efficient on a tight lot.
- Garage conversion — converting an existing garage; usually the fastest path and frequently parking-exempt.
- Junior ADU (JADU) — up to 500 sq ft within the existing home, sometimes called a granny flat or in-law unit.
We pick the type on the lot walk based on your goal — rental income, multi- generational living, or a home office — and what your lot will actually hold.
ADU rules and zoning in Redondo Beach
Redondo isn't one place to build. North Redondo — the old Golden Hills and TRW flats — is mostly single-family R-1 on flatter, regular lots, where detached ADUs and garage conversions go in cleanly. South Redondo, toward the pier and harbor, carries a lot of R-2 and R-3 multi-family zoning and older infrastructure — and California law lets you add ADUs on those lots on top of the existing units, which makes many duplex and triplex parcels far more flexible than owners expect. Our South Redondo Triplex is exactly the kind of dense, infill-aware work that a multi-family ADU calls for. The Riviera runs uphill, with view lots and slope to manage.
How long does a Redondo Beach ADU take? The permit process
The lever that matters is the ministerial ADU pathway — when a project qualifies, Redondo Beach reviews it administratively against objective standards instead of at a discretionary hearing, which is faster and far more predictable. We draw to Redondo Beach Community Development's plan-check conventions up front and run the corrections cycle, typically 8–14 weeks, then 5–9 months of construction. Two Redondo-specific items we check early: sewer capacity on older South Redondo laterals, and parking, which state law usually waives for garage conversions and transit-adjacent lots. For exactly what the counter looks for, read our field notes on ADU permits in Redondo Beach.
Why DECOMA for your Redondo Beach ADU
The expensive failures on ADUs happen in the handoff — a designer draws something the lot or zoning can't carry, or the permit set doesn't match what gets built. Because the people who draw your ADU are the people who build it, that gap doesn't exist: one contract, one schedule, one point of accountability. We've built in Redondo for decades — the South Redondo Triplex, the Redondo Beach Home, and Broadway Lofts — and the same team serves the rest of Redondo Beach and the South Bay, under one license since 1978.
Tell us your lot and what you're picturing. The first consult is free, 30 minutes, and ends with an honest read on whether your Redondo Beach ADU pencils.
How we run it
Scope to sign-off.
01
Free ADU feasibility & lot walk
We check setbacks, lot coverage, zoning, sewer, and service capacity on site — and which Redondo you're in. North Redondo R-1 lots, South Redondo R-2/R-3 multi-family parcels, and Riviera hillside lots each build differently. You get a straight read before you pay for design.
02
Design, plans & Redondo Beach permits
Construction documents drawn to Redondo Beach Community Development standards and submitted on the ministerial ADU pathway where it applies. We run the counter and the corrections cycle — generally 8–14 weeks through plan-check.
03
Build & certificate of occupancy
Foundation, frame, MEP, finishes, and any sewer, panel, or service upgrade — structural work self-performed under our Class A/B license. Typically 5–9 months on site, ending in final inspection and certificate of occupancy.
Why DECOMA
One license, three disciplines, forty years.
Family-run South Bay general contractor since 1978. We design, build, and manage — under one license — so the team you start with is the team that hands you keys and the team that answers the phone when something needs fixing in year ten.
- Years building
- 48+
- Projects delivered
- 3,000+
- Repeat clients
- 300+
- CSLB Class
- A/B
FAQ
Common questions.
How much does an ADU cost in Redondo Beach?
How long does it take to build an ADU in Redondo Beach?
Can I build an ADU on a duplex or triplex lot in South Redondo?
Can I rent out my Redondo Beach ADU?
Do I need parking for an ADU in Redondo Beach?
Do you do garage-conversion ADUs and junior ADUs (JADUs)?
Service areas
Redondo beach adu across the South Bay.
Born in Harbor City, working across LA County since 1978. Same crew, same license number, same shop at 25941 Frampton Ave, Harbor City.
Talk to a contractor
Tell us about your project.
One business day for a scope, timeline, and budget range. CSLB #375508 A/B.