Skip to content
Waterproofed window openings along a Manhattan Beach side yard on a DECOMA job

Residential

Manhattan Beach ADU contractor.

ADUs in Manhattan Beach: attached units built into new custom homes, and Tree Section garage conversions for rental income or family, designed to match the house.

Why manhattan beach adu

Manhattan Beach ADUs: two ways we build them

Most ADUs we build in Manhattan Beach fall into one of two kinds.

Attached ADUs on a new custom home. Most Manhattan Beach lots aren't big enough for a detached unit, so we design the ADU into the new house. State ADU law has its own allowances, so an attached ADU can let an owner add square footage or design features the city's standard rules wouldn't otherwise allow. On a Manhattan Beach lot, that space is worth a lot.

Garage conversions in the Tree Section. Lots in the Tree Section run larger, and many have a detached garage at the back. A lot of owners there have converted it into a custom ADU. Some rent it out, and a studio here rents from about $3,000 a month. Others use it to house their parents. On the bigger lots, we design a private entrance, so the ADU feels like a second home and neither household bothers the other.

What a garage conversion includes and costs

A basic detached garage conversion starts at roughly $150,000 all in. That includes about $10,000 for architecture, design, and the city submittal. The basic scope:

  • A new entry door at the rear
  • Sealing off the old garage door
  • Windows sized to meet egress requirements
  • A shower and bathroom
  • A closet
  • A small kitchen

From there, the price goes up with what you add. A second story, more square footage, or higher-end finishes all cost more.

The electrical service

Nearly every ADU gets a subpanel off the main house. On a rental, a separate meter is better when Southern California Edison and the city allow it, because the tenant puts the utilities in their own name and you never carry their bill. On one of our Manhattan Beach ADUs, a subpanel was the right answer. Where the house needs more capacity, we upgrade the main panel, up to 400 amps.

Make it match the house

You can tell when nobody designed an ADU. It's a door that doesn't match the house, or a mirrored garage door on an old Spanish home. In Manhattan Beach, where the houses around you are worth millions, that hurts your property. We design every ADU to match the main house so it looks like it was built with it. That's also why we build on site instead of setting a prefab unit.

Permits at 1400 Highland

Manhattan Beach runs its own Building & Safety department at 1400 Highland Ave, open Monday through Thursday, 7:30am to 5:30pm, with alternate Fridays. Plan check normally takes six to ten weeks, longer than in Torrance or Redondo Beach, and the city doesn't reward an incomplete first submittal. On sand lots, perimeter footings often go 36 inches or deeper, and west of Sepulveda we specify marine-grade stainless hardware because standard hardware doesn't survive the salt air.

For what the counter asks for, read our field notes on ADU permits in Manhattan Beach and the Manhattan Beach ADU plan-check timeline.

Start a Manhattan Beach ADU

Tell us your lot and what the ADU is for: rental income, family, or extra square footage on a new build. The first consult is free. We also serve the rest of Manhattan Beach and build ADUs next door in Hermosa Beach and Redondo Beach. Comparing builders? Read who to hire to build an ADU in the South Bay, or see our main ADU construction page.

How we run it

Scope to sign-off.

  1. 01

    Lot walk & feasibility

    We start with a survey and a look at the lot, the house, and the electrical service. On most Manhattan Beach lots that decides whether the ADU is attached, detached, or a conversion of the existing garage.

  2. 02

    Design & Manhattan Beach permits

    Our architect designs the ADU to match the house, then it goes to engineering and to Building & Safety at 1400 Highland Ave. Architecture, design, and the city submittal for a garage conversion usually run about $10,000.

  3. 03

    Build & certificate of occupancy

    Our crews build it, with licensed providers on every specialty trade. We finish with final inspection and a certificate of occupancy, so the unit can be rented legally.

Why DECOMA

One license, three disciplines, forty years.

Family-run South Bay general contractor since 1978. We design, build, and manage — under one license — so the team you start with is the team that hands you keys and the team that answers the phone when something needs fixing in year ten.

Years building
48+
Projects delivered
3,000+
Repeat clients
300+
CSLB Class
A/B

FAQ

Common questions.

How much does an ADU cost in Manhattan Beach?
A basic detached garage conversion starts at roughly $150,000 all in, including about $10,000 for architecture, design, and the city submittal. A second story, more square footage, or a new-build ADU costs more. An attached ADU built as part of a new custom home is priced with the house.
How much does an ADU rent for in Manhattan Beach?
A studio ADU in Manhattan Beach rents from about $3,000 a month. That's why so many Tree Section owners convert the garage at the back of the lot. The other common use is housing parents or other family.
Can I build a detached ADU on a Manhattan Beach lot?
On some lots. Most Manhattan Beach lots aren't big enough for a detached unit, which is why most of the ADUs we build here are attached. The larger lots in the Tree Section are the exception. There, converting an existing garage at the back of the lot is often the simplest path.
Why add an ADU to a new custom home in Manhattan Beach?
Because state ADU law has its own allowances. Designing an attached ADU into a new build can let an owner add square footage or features that the city's standard rules wouldn't otherwise allow. It's one of the main reasons we build ADUs here.
Should a Manhattan Beach ADU have its own electric meter?
If you're renting it, yes, when Southern California Edison and the city allow it. With a separate meter, the tenant puts the utilities in their own name. Otherwise the ADU runs on a subpanel off the main house. On one of our Manhattan Beach ADUs, a subpanel was the right call.
How long does an ADU permit take in Manhattan Beach?
Plan check in Manhattan Beach normally runs six to ten weeks, longer than in Torrance or Redondo Beach, and an incomplete first submittal costs you a round. Building & Safety is at 1400 Highland Ave. We prepare the set to Manhattan Beach's standards before it goes in.

Service areas

Manhattan beach adu across the South Bay.

Born in Harbor City, working across LA County since 1978. Same crew, same license number, same shop at 25941 Frampton Ave, Harbor City.

Talk to a contractor

Tell us about your project.

One business day for a scope, timeline, and budget range. CSLB #375508 A/B.